Management

Table of Contents sections 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

Next, configure the PDU’s power outlets according to the physical connection to the server or other equipment by clicking on

the tab.

Drag the target name from the right side’s current targets list to the left side’s corresponding power outlet. Double-click on the target name on the right side to remove the selection. Repeat for each power outlet, and click

when you’re done. Your PDU has been configured and the power option () becomes available from the “Access” tab.

Figure 47 Performing power commands

The following commands can be performed from the HQ interface.

Figure 46 Adding new PDUs – Outlets tab

Figure 48 Power commands

To cancel, click.

OmniView IP 5000 HQ

34

Page 38
Image 38
Belkin 5000HQ user manual Following commands can be performed from the HQ interface