Cabletron Systems STS16-20R, STS16-20D manual Installation Summary

Models: STS16-20R STS16-20D

1 258
Download 258 pages 63.79 Kb
Page 69
Image 69

55

4. Installation

This chapter contains step-by-step instructions for installing, connecting and verifying that the SmartStack STS16-20D Token Ring Switch and/or the SmartStack STS16-20R Token Ring Switch is operating properly.

Installation Summary

The installation sequence is listed in the following steps.

1.Plan for installation. Read Chapter 3, “Preparing for Installation”.

2.Unpack the switch.

3.Gather the materials.

4.Mount the switch.

5.Connect the switch to the network.

6.Verify the operation of the switch.

Note: Complete the following step only if you will be customizing the configuration of the switch or monitoring its activity.

7.Configure the switch.

Note: For information on front panel and back panel connectors, buttons, slots, and LEDs, please see “Front Panel Details” on page 5 and “Back Panel Details” on page 9 in Chapter 1.

Installation

SmartStack STS16-20D/STS16-20R Token Ring Switches Installation and User Guide

Page 69
Image 69
Cabletron Systems STS16-20R, STS16-20D manual Installation Summary