73

5. If you still can not get the connection to work, contact a support person.

Diagnostic Screen

The diagnostic self-test displays two different screens, depending on whether you perform a cold boot (power-o n cycle with full diagnostics), or a warm boot (a reset without full diagnostics). The warm boot contains portions of the complete cold boot list.

The following is an example of a diagnostic screen during a boot process. The actual screen may vary depending on, for example, hardware, options, and software version levels:

BootStrap Firmware v2.3, Copyright 1996-1998

- Initiating

bootstrapping sequence.

- Boot image

integrity check...Passed.

- Control transferred to boot process.

Boot Firmware (Phase II) v2.3

 

- Program memory test

Passed.

- Relocating

main image to

 

DRAM

Done.

- Main image

integrity check...

succeeded.

-Control transferred to main process.

-Starting Power On Self Test Diagnostics.

- Network memory test 32-bits

........Passed.

-

Network

memory

test

16-bits

........Passed.

-

Network

memory

test

8-bits

Passed.

 

- Port register

and memory test

Passed.

 

- Single port loopback test

Passed.

 

- All ports linked loopback test

Passed.

 

- Port MAC test

.....Passed.

 

- Completed Power

On Self Test Diagnostics.

 

System Software Version 4.0.0, Copyright 1994-1999.

System started on

Mon. June 21, 1999 14:30:03

 

8

Megabytes System memory

 

2

Megabytes Network memory

 

-Initialization started

-File system initialized

-System temperature is within safe operating levels

-Checking file system integrity

-Warmboot initialization started

-LAN ports detected:

-RJ-45 Token Ring: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

- StkPort

: 29

- Initializing Ports: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

Accessing Switch Management

SmartStack STS16-20D/STS16-20R Token Ring Switches Installation and User Guide

Page 87
Image 87
Cabletron Systems STS16-20R, STS16-20D manual Diagnostic Screen, StkPort