ICR Job Scheduler 123
6. Scheduling Reports
À To change a scheduled job:
1. In the ICR Job Scheduler window, select a job from the list of
scheduled jobs.
2. Click the Change button. The Job Details dialog box appears.
3. Change the fields as described in “Scheduling Reports to Print,”
earlier in this chapter.
4. When you are satisfied with the new job details, click Apply.
5. (Optional.) To reset the ICR Job Scheduler settings to their original
state, click the Reset button.
6. In the ICR Job Scheduler window, click Apply to submit the
changes to the ICR Job Scheduler. The value in the Time field
changes from 24-hour format to A.M. or P.M. You can use this as an
indicator that the job has been successfully changed and submitted.
6.1.4. Deleting Scheduled Jobs
When you no longer need to have a particular report scheduled to print,
you can remove it from the job scheduler. Print jobs scheduled using the
“Next” and “Today/Tomorrow” options are automatically deleted from
the scheduler after they have executed.
À To delete a job:
1. In the ICR Job Scheduler window, select a job from the list of
scheduled jobs.
2. Click the Delete button. A dialog box appears to check if you are
sure you want to delete the job.
3. Click OK to delete the job. The scheduled job is removed from the
list.
4. (Optional.) If you unintentionally delete a job, click Reset. The ICR
Job Scheduler settings will return to their original state.
6.1.5. Inspecting the Job Scheduler Log
The ICR Job Scheduler allows you to view log files for the different
types of jobs that are scheduled. The log files contain information on
how a job executed, which database connections were made, and
whether a print job has finished printing. You can use this data as a
diagnostic tool in case you have a problem printing a report.