USER GUIDE

ARENA/ RANGER

Or,

h.Copy switchpoints from another daily schedule to the new daily schedule as follows:

i.Right-click on the new daily schedule.

j.Select Copy switchpoints from, then click on daily schedule from which you want to copy the switchpoint settings, for example, Workday.

The copied settings are reflected on the daily schedule time table on the right.

4. Click Save button on top of the Schedules tree.

Update Daily Schedule / Edit Switchpoint

This function allows updating a daily schedule by editing the following switchpoint settings:

Value

Start and stop time

Optimization status

1.In the Schedules tree, expand the tree and click on the daily schedule you want to update.

2.In the time table, right-click in the switchpoint area (green) and click Update.

The Edit Value dialog box displays.

109

EN2Z-0906GE51 R0708

Page 109
Image 109
Honeywell EN2Z-0906GE51 R0708 manual Update Daily Schedule / Edit Switchpoint