NCT Group 99M, 2000M manual Canned Cycles for Drilling

Models: 2000M 99M

1 206
Download 206 pages 27.56 Kb
Page 135
Image 135

17 Canned Cycles for Drilling

17 Canned Cycles for Drilling

A drilling cycle may be broken up into the following operations.

Operation

1: Positioning in the Selected Plane

Operation

2: Operation After Positioning

Operation 3: Movement in Rapid Traverse to Point R

Operation

4: Operation in Point R

Operation

5: Drilling

Operation

6: Operation at the Bottom of the Hole

Operation

7: Retraction to Point R

Operation

8: Operation at Point R

Operation

9: Retraction in Rapid Traverse to the Initial Point

Operation 10: Operation at the Initial Point

Point R, point of approach. - The tool approaches the workpiece to that point in rapid traverse. Initial point. - The position of the drilling axis assumed prior to the start of cycle.

Fig. 17-1

The above operations give a general picture of a drilling cycle, some of them may be omitted in specific instances.

A drilling cycle has a positioning plane and a drilling axis. The plane of positioning and the drill axis will be selected by plane selection instructions G17, G18, G19.

 

 

 

 

G code

Positioning plane

Drilling axis

 

 

 

 

 

G17

plane Xp Yp

Zp

 

G18

plane Zp Xp

Yp

 

G19

plane Yp Zp

Xp

 

 

 

 

 

135

Page 135
Image 135
NCT Group 99M, 2000M manual Canned Cycles for Drilling