17 Canned Cycles for Drilling
17.1.7 Peck Drilling Cycle (G83)
Fig.
The variables used in the cycle are
G17 G83 Xp__ Yp__ Zp__ R__ Q__ E__ F__ L__
G18 G83 Zp__ Xp__ Yp__ R__ Q__ E__ F__ L__
G19 G83 Yp__ Zp__ Xp__ R__ Q__ E__ F__ L__
The oprations of the cycle are
1.
2.-
3.
4.-
5.drilling to the bottom point, with feed F
6.-
7.with G99,
8.-
9.with G98,
10.-
Description of drilling operation 5 is as follows:
–drilling the depth specified at address Q, with feed,
–
–
–drilling depth Q again, reckoned from the previous
–
The above procedure is carried on as far as the bottom point specified at address Z.
146