17 Canned Cycles for Drilling

 

 

 

To illustrate the foregoing, let us see the following example.

G81

X_ Y_ Z_ R_ F

(the drilling cycle is executed)

 

X

(the drilling cycle is executed)

 

F_

(the drilling cycle is not executed, F is

 

 

over-written)

 

M_

(the drilling cycle is not executed, code M

 

 

is executed)

G4

P_

(the drilling cycle is not executed, the

 

 

dwell will be re-written, but not the dwell

 

 

value of cycle variable)

 

I_ Q_

(the drilling cycle is not executed, the

 

 

programmed values will not be recorded as

 

 

cycle variables)

If a function as well as a drilling cycle are programmed in one block, the function will be executed at the end of the first operation, on completion of positioning. If L has also been programmed in the cycle, the function will be executed in the first round only.

In block-byQblock mode, the control will stop after each of operations 1, 3 and 10 during the cycle.

The STOP button is ineffective to each of operations 5, 6 and 7 of cycles G74, G84. If STOP is depressed during those operations, the control will continue its functioning, and will not stop before the end of operation 7.

The feed and the spindle override will always be 100% in each of operations 5, 6 and 7 of cycles G74, G84 regardless of the override switch setting.

If G43, G44, G49 is programmed in a cycle interpolation, or if a new value of H is specified, the length compensation will be taken into account in operation 3, invariably along the drilling axis.

Instructions G45, ... G48 will not be executed in the drilling cycle.

157

Page 157
Image 157
NCT Group 99M, 2000M manual Canned Cycles for Drilling