NCT Group 99M, 2000M manual Canned Cycles for Drilling

Models: 2000M 99M

1 206
Download 206 pages 27.56 Kb
Page 141
Image 141

17 Canned Cycles for Drilling

17.1Detailed Description of Canned Cycles 17.1.1 High Speed Peck Drilling Cycle (G73)

Fig. 17.1.1-1

The variables used in the cycle are

G17 G73 Xp__ Yp__ Zp__ R__ Q__ E__ F__ L__

G18 G73 Zp__ Xp__ Yp__ R__ Q__ E__ F__ L__

G19 G73 Yp__ Zp__ Xp__ R__ Q__ E__ F__ L__

The operations of the cycle are

1.rapid-traverse positioning

2.-

3.rapid-traverse movement to point R

4.-

5.drilling as far as the point Z, with feed F

6.-

7.with G99, retraction to point R, in rapid traverse

8.-

9.with G98, retraction to the initial point, in rapid traverse

10.-

Description of drilling operation 5 is as follows:

drilling the cut-in depth specified at address Q in the workpiece, with feed,

rapid-traverse retraction by the distance specified at address E or in parameter RETG73,

drilling cut-in depth Q again, reckoned from the end point of the previous cut-in,

rapid-traverse retraction at the value specified at address E.

The above procedure is carried on as far as the bottom point specified at address Z.

141

Page 141
Image 141
NCT Group 99M, 2000M manual Canned Cycles for Drilling