17 Canned Cycles for Drilling
17.1Detailed Description of Canned Cycles 17.1.1 High Speed Peck Drilling Cycle (G73)
Fig.
The variables used in the cycle are
G17 G73 Xp__ Yp__ Zp__ R__ Q__ E__ F__ L__
G18 G73 Zp__ Xp__ Yp__ R__ Q__ E__ F__ L__
G19 G73 Yp__ Zp__ Xp__ R__ Q__ E__ F__ L__
The operations of the cycle are
1.
2.-
3.
4.-
5.drilling as far as the point Z, with feed F
6.-
7.with G99, retraction to point R, in rapid traverse
8.-
9.with G98, retraction to the initial point, in rapid traverse
10.-
Description of drilling operation 5 is as follows:
–drilling the
–
–drilling
–
The above procedure is carried on as far as the bottom point specified at address Z.
141