Automation and Drives - SCE
T I A Training Document Page 147 of 147 Module
H01
Issued: 02/2008 Frequency Converter SINAMICS G120 on PROFIBUS DP and PROFINET
Preface Notes Startup with PROFIBUS Startup with PROFINET Program Example
6.7 Load the blocks for controlling the bucket elevator to the CPU 315-2DP
10. In the folder ’Blocks’, highlight ’OB1’, ’FC10’, ’DB20’ and ’DB21’. Load them to the CPU315F-
2PN/DP.( OB1 FC10 DB20 DB21 )
After the blocks have been transferred, the program can be started.