6.7Load the blocks for controlling the bucket elevator to the CPU
10. In the folder ’Blocks’, highlight ’OB1’, ’FC10’, ’DB20’ and ’DB21’. Load them to the CPU315F- 2PN/DP.(→ OB1 → FC10 → DB20 → DB21 → )
After the blocks have been transferred, the program can be started.
|
|
|
|
|
|
|