Automation and Drives - SCE

Hardware and Software Required

1.PC, operating system Windows 2000 Professional starting with SP4/XP Professional starting with SP1/Server 2003 with 600MHz and 512RAM, free hard disk storage approx 650 to 900 MB, MS Internet Explorer 6.0, and network card

2.Software STEP 7 V 5.4

3.Startup Software STARTER V4.1

4.Configuring Software SIZER V2.8

5.MPI for the PC (such as PC Adapter USB)

6.PLC SIMATIC S7-300 with CPU 315F-2 PN/DP and at least one digital input and output module

Sample configuration:

-Power unit: PS 307 2A

-CPU: CPU 315F-2 PN/DP

-Digital inputs: DI 16x DC 24V

-Digital Outputs: DO 16x DC 24V / 0.5 A

7.Frequency Converter SINAMICS G120 with:

-Control Unit CU240S DP

-Control Unit CU240S PN

-Basic Operator Panel BOP

-PC Connection Kit

-Asynchronous Motor

8.Ethernet connection between PC, CPU 315F-2 PN/DP and SINAMICS G120 with CU240S PN

9.PROFIBUS cable with 2 PROFIBUS connectors for connecting the CPU 315F-2 PN/DP and the SINAMICS G120 with CU240S DP

 

Preface

Notes

Startup with PROFIBUS

Startup with PROFINET

Program Example

 

 

 

 

 

 

T I A Training Document

 

Page 7 of 147

 

Module

 

 

 

H01

 

 

Issued: 02/2008

 

Frequency Converter SINAMICS G120 on PROFIBUS DP and PROFINET

Page 7
Image 7
Siemens G120 manual Hardware and Software Required