Automation and Drives - SCE

 

 

 

PAGE

1.

preface

..........................................................................................................................................................

6

2.

notes on using the CPU 315F-2 PN/DP

9

3.

notes on using the frequency converter SINAMICS G120

10

3.1 Description of the Frequency Converter SINAMICS G120

10

3.2 Configuring the Drive with the Software SIZER

16

3.3 Safety Precautions and Warnings

28

3.4 Connecting the Frequency Converter SINAMICS G120

32

 

3.4.1

Connecting the Power Module

32

 

3.4.2

Block Diagrams for the Control Units CU240S DP and CU240S PN

33

 

3.4.3

Setting the Frequency Setpoints with DIP Switches

36

 

3.4.4

Settings for the Encoder with DIP Switches

36

 

3.4.5

Setting the PROFIBUS Address with DIP Switches

36

 

3.4.6

PROFIBUS Interface

37

 

3.4.7

PROFINET Interface

37

3.5 Starting Up the Frequency Converter SINAMICS G120

38

 

3.5.1

Startup Using the Basic Operator Panel (BOP)

40

 

3.5.1.1

Function Keys of the Basic Operator Panel (BOP)

41

 

3.5.1.2

Parameters that are visible/Parameters that can be changed

42

 

3.5.1.3

BICO Technology

44

 

3.5.1.4

Changing Parameters with the Basic Operator Panel (BOP)

46

 

3.5.1.5

Starting Performance of the SINAMICS G120

48

 

3.5.1.6

Reset to Factory Setting

49

 

3.5.1.7

Quick Commissioning for V/f Control, for example

50

 

3.5.2

Startup with the Software STARTER using the Connection Kit

52

 

3.5.3

Startup with the Micro Memory Card (MMC)

72

 

3.5.3.1

Manual Parameter Upload from the Converter to the MMC

72

 

3.5.3.2

Manual Parameter Download from a MMC to the Converter

73

3.6

Exercises

74

4.

Starting Up the frequency converter SINAMICS G120 on the PROFIBUS

75

5.

starting up the frequency converter SINAMICS G120 on the PROFINET

105

6.

CONTROL PROGRAM 'BUCKET ELEVATOR’ ON THE PROFIBUS DP/PROFINET

134

6.1

Assigning the Process Data for the SINAMICS G120

134

 

6.1.1

The Control Word (STW)

134

 

6.1.2

The Status Word (ZSW)

136

 

6.1.3

The Main Setpoint (HSW)

137

 

6.1.5

Arrangement of the Request Message in Double Word Format

138

 

6.1.6

Arrangement of the Response Message in Doubleword Format

138

6.2 Assignment List and Symbol Table

........................................................................................................

139

T I A Training Document

Page 3 of 147

Module

 

H01

 

Issued: 02/2008

Frequency Converter SINAMICS G120 on PROFIBUS DP and PROFINET

Page 3
Image 3
Siemens G120 manual Preface, 105, 134