Automation and Drives - SCE
T I A Training Document Page 6 of 147 Module
H01
Issued: 02/2008 Frequency Converter SINAMICS G120 on PROFIBUS DP and PROFINET
Preface Notes Startup with PROFIBUS Startup with PROFINET Program Example
1. PREFACE
In terms of its contents, Module H01 is part of the teaching unit entitled ’Frequency Converter at
SIMATIC S7’.
Learning Objective:
In Module H01, the reader learns how the frequency converter SINAMICS G120 is started up
together with the CPU 315F-2 PN/DP on PROFIBUS DP as well on PROFINET. Module H01 shows
the method in principle, using a brief example for each the PROFIBUS and the PROFINET.
Prerequisites:
To successfully work through Module H01, the following knowledge is assumed:
Knowledge in handling Windows
Fundamentals of PLC programming with STEP 7 (for example, Module A3 - 'Startup’
PLC Programming with STEP 7)
Fundamentals of PROFIBUS DP (for example, Appendix IV – Fundamentals of Fieldbus
Systems with SIMATIC S7-300)
Fundamentals of network engineering (for example, Appendix V - Basics of Network
Engineering)
Fundamentals of
STEP 7 Programming
2 to 3 days Modules A
Industrial Fieldbus
Systems
2 to 3 days Modules D
Additional Functions of STEP 7
Programming
2 to 3 days Modules B
Process
Visualization
2 to 3 days Modules F
Programming
Languages
2 to 3 days Modules C
IT Communication
with SIMATIC S7
2 to 3 days Modules E
Plant Simulation with
SIMIT SCE
1 to 2 days Modules G
Frequency Converter
at SIMATIC S7
2 to 3 days Modules H