
Automation and Drives - SCE
1.PREFACE
In terms of its contents, Module H01 is part of the teaching unit entitled ’Frequency Converter at SIMATIC S7’.
Programming
Languages
2 to 3 days Modules C
Fundamentals of
STEP 7 Programming
2 to 3 days Modules A
Additional Functions of STEP 7
Programming
2 to 3 days Modules B
Industrial Fieldbus
Systems
2 to 3 days Modules D
Plant Simulation with
SIMIT SCE
1 to 2 days Modules G
Process
Visualization
2 to 3 days Modules F
Frequency Converter
at SIMATIC S7
2 to 3 days Modules H
IT Communication with SIMATIC S7
2 to 3 days Modules E
Learning Objective:
In Module H01, the reader learns how the frequency converter SINAMICS G120 is started up together with the CPU 
Prerequisites:
To successfully work through Module H01, the following knowledge is assumed:
•Knowledge in handling Windows
•Fundamentals of PLC programming with STEP 7 (for example, Module A3 - 'Startup’ PLC Programming with STEP 7)
•Fundamentals of PROFIBUS DP (for example, Appendix IV – Fundamentals of Fieldbus
Systems with SIMATIC 
●Fundamentals of network engineering (for example, Appendix V - Basics of Network Engineering)
| 
 | Preface | Notes | Startup with PROFIBUS | Startup with PROFINET | Program Example | 
| 
 | 
 | 
 | 
 | 
 | 
 | 
| T I A Training Document | 
 | Page 6 of 147 | 
 | Module | |
| 
 | 
 | 
 | H01 | 
 | 
 | 
| Issued: 02/2008 | 
 | Frequency Converter SINAMICS G120 on PROFIBUS DP and PROFINET | |||
