April, 2007 SERVICE PROGRAM TABLES 5-87
3501
Select ProCon Select Process Control Method
The settings of these SP codes modify the operation of the automatic process control
self-check. Automatic process control is done at these times:
W hen the machine is turned ON
At the end of the job, if the number of pages since the previous process contro,
exceeds the value of SP 3551
Before ACC adjustment
W hen the developer is initialized with SP3811.
For more about process control, see "Process Control" in Section "6.11" of the service
manual.
001
Potential Control
[0~1/1] 0:Auto, 1:Fixed
When the machine starts (with the front door closed), the process control self-check
begins using as referernce bias voltages set with the Group 3 SP codes. The
referenced voltages are different, depending on whether "Auto" or "Fixed" is set:
Referenced SPs with "Auto" Selected
SP3575 000~008 Dev DC Control
SP3576 000~008 Chrg DC Control
SP3577 000~008 Chrg AC Control
SP3581 000~008 LD Power Control
SP3551 001, 002 Procon Int
SP3554 001 Init ProCon Set
SP3801 001 DevSetup Execute
SP3811 001~006 DevSetup Execute
Reference SPs with "Fixed" Selected
SP2201 001~009 Set DC Charge
SP2202 001~009 Set AC Charge
SP2211 001~009 Set LD Power
SP2212 001~009 Set Dev DC
002
Potential Ctrl Switches process control gamma correction OFF (0) and
ON (1).
[0~1/1]
003
Density Adj Mode Sets the execution timing of toner density adjustment with
the automatic process control self-check.
[0~2/1]
0: Do not execute, 1: 1st Power On, 2:1st Power On & Job
End
004
ACC Before ProCon Determines whether process control is executed before a
gradation test pattern is printed using the operation panel
with:
[User Tools]> Maintenance> Auto Color Calibration
[0~2/2]
0:Do not execute
1:Execute Potential Control
2:Execute Potential Control and Toner Density Adjustment
005
Dnstiy Adj Times Sets the upper limit of the loop wherein density is adjusted
during process control. Default: 10