4

Assembly Replacement

This chapter describes the removal and replacement of all major assemblies. The following replacement procedures are provided:

Access to Internal Assemblies

Cable Color Code

Procedure 1. Spectrum Analyzer Cover

Procedure 2. Al Front Frame/Al8 CRT

Procedure 3. AlAl Keyboard/Front Panel Keys

Procedure 4. AlA RPG

Procedure 5. A2, A3, A4, and A5 Assemblies

Procedure 6. A6 Power Supply Assembly

Procedure 7. A6Al High Voltage Assembly

Procedure 8. A7 through Al3 Assemblies

A7 First LO Distribution Amplifier

A8 Low Band Mixer

A9 Input Attenuator

A10 YIG-Tuned Filter/Mixer (RYTHM)

All YTO

Al3 Second Converter

Procedure 9. Al4 and Al5 Assemblies

Procedure 10. Al6 Fast ADC and Al7 CRT Driver

Procedure 11. Bl Fan

Procedure 12. BTl Battery

Procedure 13. Rear Frame/Rear Dress Panel

Procedure 14. W3 Line Switch Cable

Procedure 15. EEROM (A2U501)

Procedure 16. A21 OCXO (Non-Option 103)

Tools required to perform the procedures are listed in Table 4-l.

The words right and left are used throughout the replacement procedures to indicate the side of the spectrum analyzer as viewed from the front panel.

Numbers in parentheses are used throughout the replacement procedures to indicate numerical callouts on the figures.

Caution The spectrum analyzer contains static-sensitive components. Read the section entitled, “Electrostatic Discharge” in Chapter 1, “General Information.”

Assembly Replacement 4-1

Page 126
Image 126
Agilent Technologies 856290216 service manual Assembly Replacement