Procedure 2. Al Front Frame/Al8 CRT

15.Use a 5/16-inch wrench to connect W41 from the A9 input attenuator to the front panel INPUT 50R connector. Make sure that W40, W36, and AlWl are routed between W41 and the attenuator bracket. Secure the A9 input attenuator bracket to the center support on the front frame using one panhead screw. See Figure 4-3 (2).

16.Place led AlWlDSl into the line-power switch assembly.

17.Attach the line switch assembly into the front frame using one panhead screw. Be sure to connect the line-power switch ground lug with the screw. The screw is captive.

18.Fold up the Al4 and Al5 assemblies as described in “Procedure 9. Al4 and Al5 Assemblies Replacement,” steps 3 through 5.

19.Place the spectrum analyzer top-side-up on the work bench and connect AlAlWl to A3J602.

20.Snap post-accelerator cable A6AlW3 to the A18 CRT assembly.

21.Snap the black grommet protecting the A6AlW3 into the CRT shield.

22.Fold up assemblies A2, A3, A4, and A5 as described in “Procedure 5. A2, A3, A4, and A5 Assemblies Replacement,” steps 6 through 12.

23.Replace the spectrum analyzer cover assembly.

24.Connect the line-power cord and switch the spectrum analyzer power on. If the display does not operate properly, turn off spectrum analyzer power, disconnect the line cord, and recheck the spectrum analyzer.

4-12 Assembly Replacement

Page 137
Image 137