Agilent Technologies 856290216 Placing the CRT into the Front Frame, Assembly Replacement 4-l

Models: 856290216

1 482
Download 482 pages 3.94 Kb
Page 136
Image 136

Procedure 2. Al Front Frame/Al8 CRT

AIAIWI

SK127

Figure 4-8. Placing the CRT into the Front Frame

5.Connect A18Wl to A17J5.

6.Snap CRT cable W9 onto the end of the CRT assembly.

7.Fully seat the front frame and CRT assemblies into the spectrum analyzer.

8.Secure the front frame to the side frames of the spectrum analyzer, using three flathead screws per side. See Figure 4-4.

9.Retighten the four screws securing the CRT mounts to the deck.

10.Place W9 between the CRT assembly and the A6 power supply assembly top shield so that the W9 wires are below the surface of the top shield.

11.Connect W42 to A7J5 and the front panel First LO OUTPUT connector.

12.Use a 9/16-inch nut driver to reconnect CAL OUTPUT connector to the front panel.

13.Connect the VOLUME potentiometer and knob to the front panel.

14.Connect W36, coax 86, to the front panel IF INPUT connector.

Assembly Replacement 4-l 1

Page 136
Image 136
Agilent Technologies 856290216 service manual Placing the CRT into the Front Frame, Assembly Replacement 4-l