Agilent Technologies 856290216 service manual Procedure 7. A6Al High Voltage Assembly

Models: 856290216

1 482
Download 482 pages 3.94 Kb
Page 152
Image 152

Procedure 7. A6Al High Voltage Assembly

7.Place the Al7 CRT Driver assembly into the center-deck mounting slot nearest the CRT. Use caution when routing cables to avoid damage.

8.For Option 007 spectrum analyzers: Place the Al6 FADC assembly into the center-deck mounting slot nearest the left side frame. Ensure that the Al6 FADC assembly is properly seated in the right end of the slot.

9.Secure the Al7 assembly (and Al6 assembly in Option 007) with the two flathead screws removed in step 18 under “Removal.” See Figure 4-13 (2).

10.For Option 007 spectrum analyzers: Connect the two mounting posts to the left side frame using the two screws removed in step 17 under “Removal.” See Figure 4-13 (1).

11.Fold the A2, A3, A4, and A5 assemblies into the spectrum analyzer and secure the spectrum analyzer cover assembly as described in “Procedure 5. A2, A3, A4, and A5 Assemblies.”

Assembly Replacement 4-27

Page 152
Image 152
Agilent Technologies 856290216 service manual Procedure 7. A6Al High Voltage Assembly