A-6ADMINISTRATION REQUIREMENTS

Primary

System 75 must obtain synchronization timing from a 4ESS. Typically, the

 

carrier slot location for the DS1 connecting to a 4ESS is used as the primary

 

source. The switch must also be equipped with a TN741.

Secondary

If multiple DS1s are present in a System 75 and are connected to this or other

 

4ESSs, then it may be desirable to enter their slot locations as a secondary

 

synchronization source. Refer to chapter 5, Synchronization of Digital Network

 

Facilities, for details.

Location

Circuit pack slot location (as required)

Name

Enter the facility name (if applicable)

Slip

Generally, DS1 facilities are very stable. Therefore, in most applications, a y

 

should be entered.

Page 304
Image 304
AT&T DS1/DMi/ISDN-PRI manual Facilities, for details, 6ADMINISTRATION Requirements