Chapter 2 Introduction to the SCE Platform
SCE 2000 Installation Checklist
SCE 2000 Installation Checklist
To assist you with your installation and to provide a historical record of what was done by whom, photocopy the following SCE 2000 Installation Checklist. Indicate when each procedure or verification is completed. When the checklist is completed, place it in your site log along with the other records for your new SCE 2000 platform.
Table | SCE 2000 Installation Checklist | ||
|
|
|
|
Task |
| Verified | Date |
|
| By |
|
|
|
| |
Date SCE 2000 received |
|
| |
|
|
| |
SCE 2000 and all accessories unpacked |
|
| |
|
|
| |
Safety recommendations and guidelines reviewed |
|
| |
|
|
| |
Topology verified: number of SCE 2000 platforms, number of links, and |
|
| |
whether inline or |
|
| |
|
|
| |
Installation Checklist copied |
|
| |
|
|
| |
Site log established and background information entered |
|
| |
|
|
| |
Site power voltages verified |
|
| |
|
|
| |
Site environmental specifications verified |
|
| |
|
|
| |
Required passwords, IP addresses, device names, and so on, needed for |
|
| |
initial configuration available (refer to Setup Command Parameters (on |
|
| |
page |
|
|
|
|
|
| |
Required tools available |
|
| |
|
|
| |
Network connection equipment available |
|
| |
|
|
| |
SCE 2000 mounted in rack (optional) |
|
| |
|
|
| |
AC/DC power cables connected to AC/DC sources and SCE 2000 platform |
|
| |
|
|
| |
Console port set for 9600 baud, 8 data bits, no parity, and 1 stop bit (9600 |
|
| |
8N1) |
|
|
|
|
|
| |
ASCII terminal attached to console port |
|
| |
|
|
| |
FE management ports are operational |
|
| |
|
|
| |
FE line and cascade ports operational |
|
| |
|
|
| |
Network interface cables and devices connected |
|
| |
|
|
| |
System power turned on |
|
| |
|
|
| |
System boot complete |
|
| |
|
|
| |
Correct hardware configuration displayed after system banner appears |
|
| |
|
|
|
|
Cisco SCE 2000 4/8xFE Installation and Configuration Guide
| ||
|
|
|