Overview of Startup Procedure

Table 3-1. Startup Overview (Continued)

Stage

 

What you will need to do...

Refer to...

 

On

 

 

page...

 

 

 

 

 

 

 

 

 

 

4

Install adapter boards and transition modules.

Transition

 

3-17

 

 

 

Modules and

 

 

 

 

 

Adapter Boards

 

 

 

 

 

Overview

 

 

 

 

 

 

 

 

 

 

 

Installing

 

3-20

 

 

 

Transition

 

 

 

 

 

Modules and

 

 

 

 

 

Adapter Boards

 

 

 

 

 

 

 

 

 

Set jumpers on the transition module(s).

The userÕs manual you

 

 

 

received with your

 

 

 

Connect and install the MVME712X

 

 

 

MVME712X

 

 

 

transition module.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Connect and install the P2 adapter board.

 

 

 

 

 

 

 

 

 

5

Connect peripherals.

Connecting

 

3-20

 

 

 

Peripherals

 

 

 

 

 

 

 

 

 

Connect and install any optional SCSI

You may also wish to

 

 

device cables.

obtain the Single Board

 

 

 

Computer SCSI Software

 

 

Connect a console terminal to the

 

 

UserÕs Manual

 

 

 

MVME712X.

 

 

 

 

 

 

 

 

 

 

 

 

 

Connect any other optional devices or

EIA-232-D

 

E-1

 

 

equipment you will be using, such as

Interconnections

 

 

 

 

serial or parallel printers, host computers,

 

 

 

 

 

Port Numbers

 

5-7

 

 

etc.

 

 

 

 

 

 

 

 

 

Disk/Tape

 

B-1

 

 

 

Controller Data

 

 

 

 

 

 

 

 

6

Complete the installation.

The userÕs

 

3-24

 

 

 

manual you

 

 

 

 

Reassemble chassis.

 

 

 

 

received with

 

 

 

 

 

 

 

 

 

Reconnect AC power.

your chassis

 

 

 

 

 

 

 

 

3

3-3

Page 55
Image 55
Motorola MVME187 manual Stage What you will need to do Refer to, Connect peripherals, Complete the installation