June 2007

Replacing basic chassis components

Figure 20: Front panel

„Hard drive 0 is on the right (T). The status LED of hard drive 0 is marked with the hard drive symbol and the number 0 (M).

„Hard drive 1 is on the left (R). The status LED of hard drive 1 is marked with the hard drive symbol and the number 1 (L).

4Press the green latch (A) on the front of the hard drive carrier as shown in the following diagram.

1005r Server Maintenance and Diagnostics

115

Page 115
Image 115
Nortel Networks 1005r manual Front panel