June 2007

Troubleshooting your CallPilot system

Basic hardware check

This section describes some basic checks that you can do when you start up the server.

To run the startup test

1Ensure system is powered down and AC cords are disconnected. Wait five seconds before turning on the power again.

2Apply AC power to the server by plugging in the first AC cord and then the second AC cord. Observe the front panel display.

Figure 3: 1005r front panel.

Result: All the LEDs on the front panel illuminate for a fraction of a second.

Note: The back panel LEDs on each power supply start blinking green when the AC power is applied and then turn solid green after

1005r Server Maintenance and Diagnostics

27

Page 27
Image 27
Nortel Networks 1005r manual Basic hardware check, To run the startup test