Nortel Networks NN43001-301 manual Remove the NT5D97 DDP2

Models: NN43001-301

1 306
Download 306 pages 36.63 Kb
Page 140
Image 140

140NT5D97 Dual-port DTI2/PRI2 installation and removal

CAUTION

Clock Controller cables connecting the Clock Controller and NT5D97 card must NOT be routed through the center of the cabinet past the power harness. Instead they should be routed around the outside of the equipment shelves.

9If required, install connecting blocks at the MDF or wall mounted crossconnect terminal.

10If required, designate connecting blocks at the MDF or wall mounted crossconnect terminal.

11If required, install a Network Channel Terminating Equipment (NCTE). or Line Terminating Unit (LTU).

12Add related office data into switch memory.

13Enable faceplate switch S1. This is the "Loop Enable" switch.

The faceplate LEDs should go on for 4 seconds then go off and the OOS, DIS and ACT LEDs should go on again and stay on. IF DDCH is installed, the DCH LED should flash 3 times.

14Run the PRI/DTI Verification Test.

15Run the PRI status check.

—End—

Remove the NT5D97 DDP2

Use Procedure 15 "Remove the NT5D97 from Large Systems" (page

141)to remove the NT5D97 from Large Systems

CAUTION

The static discharge bracelet located inside the cabinet must be worn before handling circuit cards. Failure to wear the bracelet can result in damage to the circuit cards.

Nortel Communication Server 1000

ISDN Primary Rate Interface Installation and Commissioning

NN43001-301 02.03 Standard

Release 5.5 7 December 2007

Copyright © 2003-2007, Nortel Networks

Page 140
Image 140
Nortel Networks NN43001-301 manual Remove the NT5D97 DDP2, 140 NT5D97 Dual-port DTI2/PRI2 installation and removal