82

Page 69 of 332

Chapter 4 — Creating an equipment layout plan and a card slot assignment plan

Take some time to plan the installation of the Option 11C Mini. This preparation helps to make sure that the system performs correctly. Develop a layout plan for the equipment to determine where you will position each system component.

Give consideration to the lengths of the different cables, so that you make the best use of available space. Refer to Table 5 on page 37 of this guide for a description of Option 11C Mini cable and wire specifications.

Preparation of the site according to the plan is very important. Make sure that the site is ready to accept the equipment. Make sure that items, such as power outlets and backboards, are installed correctly.

Equipment layout plan

General layout guidelines

CAUTION

Make sure that the mounting surface can support at least 100 lb (45 kg).

The following are the installation options for the Option 11C Mini chassis:

wall installation

Option 11C Mini Planning and Installation Guide

Page 69
Image 69
Nortel Networks Option 11C Mini manual Equipment layout plan, General layout guidelines