Installation

Section 3-1

Note On unpacking the NT631/NT631C and peripheral devices, check their exter- nal appearance and confirm that there is no damage. Also confirm that there is no abnormal noise on shaking the PT lightly.

3-1 Installation

Install the NT631/NT631C in the operation panel and connect the power to the NT631/NT631C as described below.

3-1-1 Installation Environment

Observe the following points when installing the PT in an operation panel.

Note 1. Do not install the PT at sites subject to the following conditions.

Severe temperature variations

Temperatures or humidities outside the ranges stated in the specifica- tions

High humidity, condensation

Splashing chemical agents

Severe oil splashing

Corrosive or flammable gases

Strong vibrations or shocks

Direct exposure to wind and rain (outdoor sites)

Strong ultra-violet irradiation

2.Take adequate measures to ensure shielding if the PT is used at a location subject to any of the following conditions.

Static electricity, or noise from other equipment

Strong electromagnetic fields

Nearby power cables

Potential exposure to radioactivity

3-1-2 Installation in the Operation Panel

The NT631/NT631C is mounted in an operation panel by embedding it in the panel.

Use the panel fittings and tool (Phillips screwdriver) included in the product package and follow the procedure below.

1,2,3... 1. Open a hole of the dimensions shown below in the panel and install the NT631/NT631C from the front side of the panel.

238 + 0.5 mm

0 mm

303 + 0.5 mm

0 mm

2. Attach the panel fittings at the following positions shown below, from the rear of the NT631/NT631C.

Fit the hook of the fitting in the square hole in the body and tighten the screw with the Phillips head screwdriver while lightly pulling the fitting.

32

Page 49
Image 49
Omron NT631C manual Installation Environment, Installation in the Operation Panel