Installation

Section 3-1

Fittings at the two (*) positions are not necessary if you do not need it dust proof and waterproof.

RE S ET

R DA T RM RDB S DA S DB CS A

CS B

24 V + D C

(:)

PRINTER

 

PORT B

 

PORT A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(:)

Note 1. During work at the panel, take care to ensure that no metal scraps enter the PT.

2.The thickness of applicable operation panel is 1.6 mm to 4.8 mm. All fit- tings must be tightened uniformly to a torque of 0.5 to 0.6 Nm in order to ensure water- and dust-resistance. Front sheet of NT631/NT631C may be warped if the tightening is too strong or not uniformity. The panel must not be soiled or warped, and must be able to support an installation that will remain secure and strong.

3-1-3 Power Supply Connection

Connect a 24 VDC power supply to the power input terminals.

Note 1. Depending on how the power is switched ON/OFF, the entire system may stop. Follow the correct procedure when switching the power ON/OFF.

2.Carefully check the wiring before switching ON the power.

3.Do not connect AC power to the DC terminals.

4.Use DC power supplies with low voltage fluctuation.

5.Do not perform a dielectric strength test.

6.If complying with EC directives (low voltage directives), the following points must be noted (compliance with EC directives):

a.Use a power supply with reinforced insulation.

b.When installing NT631-ST211(B)-EV2 on the ultimate system, the rear of the NT631 must be placed within an enclosure to restrict the operators’ use only to the front panel.

7.When using NT631-ST211(B)-EV2, warm-up time of the power supply must be 200 ms or less. If longer than this, NT631 may not boot up.

24 VDC

Breaker

24 VDC power supply

33

Page 50
Image 50
Omron NT631C manual Power Supply Connection