Installation
Refer to Appendix A in this manual for Switch power requirements.
a.Connect the power cable to the back of the chassis.
b.Connect the other end of the power cable to a 3 wire, grounded, AC outlet that delivers power in accordance with the power requirements specified in Appendix A.
Note:
Following the connection of AC power to the chassis, the fans start turning immediately but power is not applied to the logic until the Power button is pressed.
c.Press the Power Button. Refer to Figure
The
Logic Power Good LED
The Logic Power Good LED on the front of the chassis will light when the internal power supply is supplying DC power within its normal operating limits and the Power Button is depressed. Refer to Figure
If the Logic Power Good LED fails to light when the Power Button is depressed, ensure that both ends of the power cord are properly plugged in, the AC power source is turned ON, and that the input fuses are good.
If you have checked these things and the Power Good LED still is not lit, contact Ancor Customer Service or your authorized maintenance provider. Do not proceed to Step 6 unless the Power Good LED is lit.
6. Check the Power-On-Self-Test (POST) Results
When the Power Supply applies DC power to the Switch logic, the logic runs a
About three seconds after the Power Good LED comes on, POST will be complete. At this point the Heartbeat LED will start to indicate whether or not there is a POST error. Check the Heartbeat LED. Figure
If the Heartbeat LED is blinking about once every second, the POST passed and you may go to the next step.
If the Heartbeat LED is not blinking once every second, the POST failed. Note what the Heartbeat LED is indicating (by the flash pattern) and contact Ancor Customer Service or your authorized maintenance provider. Do not proceed to
GigWorks | Installation | |
Installer's/User's Manual |