Part III | Model 6600 | |
|
|
|
|
|
|
|
|
|
Guide for Oil in Water Analyzer Systems:
Please refer to your particular piping, outline, and
wiring drawings of your supplied system in the addendum portion of this manual.
General requirements for the oil in water systems are’
Notes:- Sample must be representative and single phase with no high particulates (<40 NTU) nor slugs of oil present that could plug inlet lines. Plugging may require flushing with utility water and/or disassembly of components for mainte- nance or cleaning.
- Sampling time delays must fit the process con- trol requirements
A Site requirements:
1Protection from the elements: We recommend the customer provide protection on the Enclosure (especially on an offshore platform) concerning the following: i.e., direct sunlight, wind sheltering with suitable mechanical floor and wall supports if possible.
2Protection (shock mounts) from large vibrations such as pumps and valve operations.
3Always continuous and free flowing with proper high enough sample inlet gravity fed lines for prevention of cavitation and easy