Teledyne 6600 manual B Installation, Electrical connections

Models: 6600

1 151
Download 151 pages 30.8 Kb
Page 139
Image 139
B Installation:

Oil in Water

Part III

 

 

 

 

 

 

 

 

 

pumps. (Some pumps depending upon their application requirements, may be required to supply high flow, high differential pressures, high suction (lift) or head pressures and high absolute operating pressures). Because of this and other functions, certain pumps may not be allowed to run dry. (Consult factory for recommendations on your particular pump used).

4Recommend instrument power source be within+/- 10% of recommended nominal line voltages and current.

5Recommend spacing be made available for maintenance and access thereof, i.e., cabinet door openings, etc.

6Sample tap requirements:

a)Heat tracing to prevent freezing of water(s), or salt laden produced or rig-wash sample fluids

b)Proper gravity fed lines as indicated above

c)Drain openings or returns for the system that won’t plug

d)Sampling probes to be placed for homogenous and representative extraction without stagnation or dead-volumes and to prevent entrained air, suspended solids withdrawal without using fine filters which could remove oil being measured.

B Installation:

1 Electrical connections-

Teledyne Analytical Instruments

Part III: 1-49

Page 139
Image 139
Teledyne 6600 manual B Installation, Electrical connections