Performance Verification

Verifying Crosstalk Specs

Step 9. Move the shorts to the next pair of test ports. (Only one short actually needs to be moved.) Repeat Step 7 and Step 8.

Step 10. Repeat Step 9 until all seven adjacent pairs of test ports have been measured.

Table 5-9

Pass/Fail Test Results for Crosstalk

 

 

 

 

 

Test Ports

Result

 

 

 

 

 

 

1 and 2

 

 

 

 

 

 

 

2 and 3

 

 

 

 

 

 

 

3 and 4

 

 

 

 

 

 

 

4 and 5

 

 

 

 

 

 

 

5 and 6

 

 

 

 

 

 

 

6 and 7

 

 

 

 

 

 

 

7 and 8

 

 

 

 

 

 

5 -40

Agilent Technologies Z5623A Option H48

Page 108
Image 108
Agilent Technologies Z5623A manual Pass/Fail Test Results for Crosstalk, Test Ports Result