SATISFYING MINIMAL REQUIREMENTS FOR OPTION E 15-PIN USER PORT

Apex 1 to 5.5 kW Generator

SATISFYING MINIMAL REQUIREMENTS FOR OPTION E 15-PIN USER PORT

Regardless of whether you are controlling and monitoring the generator through the User port or through another port, two User port signals must be satisfied for the Apex unit to be operational: RF POWER ENABLE (pins 4 and 9) and INTERLOCK (pins 11 and 12). In other words, even if you are controlling the generator through the serial port interface, the RF signal must be enabled and the interlock satisfied.

Note: If you are controlling your generator through a port other than the User port, make sure that the control mode is set appropriately (to host mode to control through the Host port, for example) before powering up the unit. The control mode can be set through a Host port command.

If you are not using the User port to control or monitor the unit, you can use a

“dummy” or “cheater” plug to satisfy these two signals, thereby ignoring the User port. To make such a plug, solder two jumpers on a mating connector: one between pins 4 and 9 to satisfy the RF POWER ENABLE signal and one between pins 11 and 12 to satisfy the INTERLOCK signal. To determine the physical location of these pin numbers on the User port, see Figure 4-3 on page 4-26.

If desired, you can add an emergency off switch in series with the RF POWER ENABLE signal (pins 4 and 9) or tie your system interlocks in series with the generator INTERLOCK signal (pins 11 and 12) by following the connections for those pins described in “Pin Description for Option E User Port” on page 4-27 and “Wiring Diagrams for Option E User Port” on page 4-32.

INTERFACE CABLING REQUIREMENTS FOR OPTION E USER PORT

The cable used to connect the Apex generator’s User port to the system controller must be a shielded, 15-wire I/O cable. Twisted-pair wiring may be used but is not mandatory. Signal losses should be minimized by keeping the cable length as short as possible. The maximum recommended cable length between the generator and the controller is 10 meters (33´). To minimize interference from adjacent electrical equipment, the EMI shield in the cable must be terminated to the metal shells of the cable’s connectors. Additionally, the chassis of the Apex generator must be tied to a local earth ground through an adequately sized copper grounding strap.

PIN DESCRIPTION FOR OPTION E USER PORT

Table 4-3 provides the connector pin information for the User port interface.