Apex 1 to 5.5 kW Generator
Installation, Setup, and Operation
Chapter
5
This chapter guides you through the process of installing, setting up, and operating an Apex generator. It includes the following sections:
•“Installing the Generator” on page
•“First Time Operation” on page
•“Normal Operation” on page
•“Understanding and Setting Up Pulsing Output” on page
Because Apex generators are equipped with varying options, not all of the information in this chapter applies to every Apex generator. In places where the information is
INSTALLING THE GENERATOR
The following sections provide information to help you install the Apex generator.
Unpacking
Unpack and inspect the generator carefully. Check for obvious physical damage. If no damage is apparent, proceed with the unit connections. If you do see signs of shipping damage, contact Advanced Energy Industries, Inc., and the carrier immediately. Save the shipping container for submitting necessary claims to the carrier.
Grounding
The unit provides two threaded grounding holes (one is a metric
Note: For more information about grounding, refer to AE Application Notes titled Grounding p/n 5600031A.