
Apex 1 to 5.5 kW Generator
5.Verify that the Alarm LED is not lit. If it is lit, see “Troubleshooting guide” on page
6.Verify that the Interlock LED is lit. If it is not lit, See “Troubleshooting guide” on page
7.Send RF On command and verify that the RF ON LED is on. If it is flashing or is not lit, see “Troubleshooting guide” on page
8.Request a setpoint and verify that the Power Limit LED is not lit. If it is lit, see “Troubleshooting guide” on page
9.If the Apex unit is delivering power and the power limit LED is not lit, the unit is functioning properly.
NORMAL OPERATION
Each time the generator is powered on, the
Specific operating techniques vary depending on the control and monitoring interface. If you are using Virtual Front Panel to operate the generator, see the User Manual that came with the software for further operational instructions.
UNDERSTANDING AND SETTING UP PULSING OUTPUT
As of January 2001, only the AEBus Host Port (PIN 6 option 0) supports pulsing. Add info about conversion pricing, etc. after unit has been in the field.
Some Apex units have a pulsing option, which allows you to produce either pulsed RF output or standard, steady output. To determine if your Apex unit has this option, use the configuration PIN from your Apex unit and the following Configuration Note.