8. Click Begin. The following indicators on the Firmware Loader window show the
progress of the update:
The Transfer Time field shows the amounts of remaining and elapsed time for the
update.
The Total Progress field displays a status bar with Uploading... above it.
In the Devices section, the Progress column displays an incrementing percentage
and the Status column displays Uploading.
Figure 38. Firmware Upload in Progress
When the upload is complete, the Remaining Time field shows 00.00.00, the
Progress column shows 100%, and Completed is displayed above the progress bar and
in the Status field.
At this point, the DVS resets itself. The LCD screen on the unit displays Restarting
Please Wait..., then Initializing Please Wait... . When the reset is complete,
all the buttons on the front panel flash red, then green, then amber; and the LCD screen
returns to the default cycle.
9. When the firmware upload and unit reset are complete, close the Firmware Loader