UL | Installation |
2.7 UL
| ||
|
*Ferrite Beads
*Ferrite Beads
AC Power
Ground Strap
Grounding Stud
To Batteries
maintain minimum 0.25” between
Circuits
92udulpw.cdr
Per FCC requirements, ferrite beads are required for the DC Power Outputs, Remote Power Supply Sync, ACS Output and SLC Circuit.
Close ferrite bead.
35 |