
Mounting and Wiring
Wiring Communication Links
Installing ferrite clamp for CE compliance
This procedure ensures that unwanted radio frequency noise is filtered. It is required for CE compliance.
Parts needed
Part #
047260
089037
Quantity
1
2
Description
Ferrite cable clamps
Nylon cable ties
Installing ferrite clamp
Step
1
2
3
4
5
Action
Disconnect all power to the instrument.
See Figure 24. Attach the ferrite clamp around all the wires as close to the Configuration port terminals as possible (within ½” of the terminals). For maximum shielding you must minimize the amount of unshielded exposed wire. The ferrite clamp should overlap or abut the cable shield enclosing the wires.
Snap the ferrite clamp closed, making sure to not pinch the wires.
To prevent the ferrite clamp from sliding, attach cable ties around the wires snugly against each end of the ferrite clamp.
Trim the cable tie but leave a “tail” of approximately 1”.
Terminals


Attach ties snugly against each side of the clamp.
Figure 24 Ferrite clamp installation
Release F | UMC800 Controller Installation and User Guide | 39 |
4/01 |
|
|