Installation and Configuration

To rackmount the autoloader:

1.Use the template that shipped with the library to mark the location of the clip nuts and mounting hardware on the mounting rails of the rack.

Figure 6: Measuring with the rack template

2.Install two clip nuts into each front rail of the rack in the hole locations marked using the template.

3.Install two clip nuts into each back rail of the rack in the hole locations marked using the template.

4.If there are no devices installed below the autoloader, use the optional installation rails to help support the autoloader during installation:

a.Install four clip nuts at the front of the rack, two on each rail. Install the first clip nuts two holes below the bottom autoloader clip nut. Install the second clips nuts two holes below the first clip nuts.

b.Insert one optional mounting rail into the rack with the support ledge facing in.

SSL1016 Tape Autoloader Reference Guide

27

Page 27
Image 27
HP SSL1016 manual Measuring with the rack template