Section 3
Getting Started with SANbox SSP
This section describes the tasks you must perform before you begin to install, configure, and operate the SANbox SSP. The tasks should be performed in the order presented in this section.
This section covers the following tasks:
■Task Roadmap
■Checking Package Contents
■Setting Up SANbox SSP
■Managing your Configuration
3.1
Task Roadmap
Table
Table 3-1. Roadmap of Setup Tasks
| For This Setup Step: | See: |
|
|
|
1. | For a | ■ |
| obtain information about | overview information. |
| ■ "Setting up a | |
| that use SANbox SSPs and SVM | page |
| appliances. | each component of a |
2. | Unpack and set up the hardware: | ■ "Checking Package Contents" on page |
| mount the SANbox SSP in a rack, | ■ "Setting Up SANbox SSP Hardware" on |
| install the power supplies, and | page |
| connect the console port. |
|
|
|
|
3. | Start up and configure the SANbox | ■ "Accessing SANbox SSP for the First Time" on |
| SSPs: configure the terminal | page |
| settings on the host, use the serial | ■ "Accessing SANbox SSP for the First Time" on |
| console port, and modify the | page |
| Ethernet settings for remote |
|
| access. |
|
4. | Connect SVM appliances, | ■ "Connecting to the SAN" on page |
| SANbox SSPs, and hosts to the |
|
| SAN. |
|
|
|
|