3 – Getting Started with SANbox SSP Checking Package Contents

Q

Table 3-1. Roadmap of Setup Tasks (Continued)

 

For This Setup Step:

See:

 

 

 

5.

In Section 4 SANbox SSP

"SAN Zoning" on page 5-3

 

Management GUI Reference get

"Configuring Storage" on page 5-6.

 

tips about zoning your SAN and

"To create storage pools:" on page 5-8.

 

configuring storage, and use the

"To create a user defined host (UDH) and set the

 

SVM GUI to manage your

SCSI personality:" on page 5-9.

 

configuration.

 

 

 

 

6.

Review the troubleshooting

Section 7 Troubleshooting

 

information as needed.

 

3.2

Checking Package Contents

CAUTION! Before shipping SANbox SSP to another site, remove the power supplies. SANbox SSP must not be shipped with the power supplies installed.

Ensure that all the components of the SANbox SSP arrived in the package. Save the shipping container, foam inserts, and anti-static bags; returning SANbox SSP without this packaging may void its warranty. Check the contents of the package to make sure that you received the following items and components:

1 SANbox 8200-08 SSP, SANbox 8202-08 SSP, or SANbox 8202-16 SSP

1 SANbox SSP CD-ROM:

SANbox 8200 Series Storage Services Platform Quick Start Guide for StoreAge SVM

SANbox SSP Release Notes

Installation/Upgrade software including OS and application

End User License Agreement

Release Notes

1 RS-232 serial null modem cable

2 SANbox SSP power supplies (SANbox 8202-08 SSP and SANbox 8202-16 SSP) or

1 SANbox SSP power supply (SANbox 8200-08 SSP)

2 U.S. power supply cords (SANbox 8202-08 SSP and SANbox 8202-16 SSP) or 1 U.S. power supply cord (SANbox 8200-08 SSP)

Rack mount kit, if ordered

3-2

SN0054628-00 A

Page 28
Image 28
Q-Logic 8200 SERIES manual Checking Package Contents