SAGEM 3P@C

Figure 4-21 Fixing the hangers onto the 10U chassis............................................................................................

4-16

Figure 4-22 Insert the 10U chassis into the rack and fix it .....................................................................................

4-16

Figure 4-23 Install the fan supports ........................................................................................................................

4-17

Figure 4-24 Install the fan module ..........................................................................................................................

4-17

Figure 4-25 Operate the puller adapter ..................................................................................................................

4-18

Figure 4-26 Install the air deflector frame...............................................................................................................

4-19

Figure 4-27 Completion of the installation of a single general chassis ..................................................................

4-20

Figure 4-28 Installation of the -48V DC power cables............................................................................................

4-21

Figure 4-29 Power cable connection of the fans ....................................................................................................

4-22

Figure 4-30 Panel view of the SUMB......................................................................................................................

4-23

Figure 4-31 Insert the pins of the uplink interface module into the socket of the SMUB........................................

4-24

Figure 4-32 Fix the uplink interface module with screws........................................................................................

4-25

Figure 4-33 Installation position of the RTU ...........................................................................................................

4-25

Figure 4-34 Insert the pins of the RTU into the socket of the SMUB .....................................................................

4-26

Figure 4-35 Fix the RTU with screws......................................................................................................................

4-26

Figure 4-36 Rear view of the RTU installed with screws and nuts .........................................................................

4-27

Figure 4-37 Installation of the SMUB......................................................................................................................

4-27

Figure 4-38 RJ-45 connector ..................................................................................................................................

4-28

Figure 4-39 Illustration of making a straight-through cable ....................................................................................

4-29

Figure 4-40 Illustration of making a crossover cable ..............................................................................................

4-29

Figure 4-41 Ethernet interface connection of the SMUB........................................................................................

4-30

Figure 4-42 SC optical connector ...........................................................................................................................

4-30

Figure 4-43 Uplink optical interface connection......................................................................................................

4-31

Figure 4-44 Install a dummy panel .........................................................................................................................

4-32

Figure 4-45 Installation of the LU and LC subscriber cables on the backplane .....................................................

4-33

Figure 4-46 Pinouts of the LU subscriber cable .....................................................................................................

4-33

Figure 4-47 Pinouts of the LC telephone line .........................................................................................................

4-34

Figure 4-48 Cable bending and binding .................................................................................................................

4-36

Figure 4-49 Single binding......................................................................................................................................

4-37

Figure 4-50 Double binding ....................................................................................................................................

4-37

Figure 4-51 Console interface connection..............................................................................................................

4-38

Figure 4-52 Input the connection name and select an icon for it............................................................................

4-38

Figure 4-53 Select the connecting serial port .........................................................................................................

4-39

Figure 4-54 Communication parameter setting ......................................................................................................

4-39

Figure 4-55 Select the terminal emulation type ......................................................................................................

4-40

Figure 5-1 Requirements for cabling length .............................................................................................................

5-1

Figure 5-2 Parallel and crossed net spacing ............................................................................................................

5-3

Figure 5-3 Direct overhead cabling between two buildings without any protection (1) ............................................

5-3

 

 

3P@C Installation Manual

 

Page 0-10

Reproduction and communication in any form prohibited without the written permission of SAGEM SA