|
|
| SAGEM 3P@C |
3.1.4. | Heat Dissipation Requirements | ||
3.1.5. | Power Supply Requirements | ||
3.1.6. | Grounding Requirements | ||
3.1.7. | |||
3.1.8. | Other Requirements | ||
3.2. | SAFETY REQUIREMENTS | ||
3.2.1. | Basic Safety Requirements | ||
3.2.2. | Antistatic Requirements | ||
3.2.3. | Avoiding Laser Damage | ||
3.2.4. | Lightning Protection Requirements | ||
3.2.5. | |||
3.2.6. | Fireproof Design Requirements | ||
3.2.7. Precautions for Equipment Handling | |||
3.3. INSTALLATION TOOLS AND MATERIALS | |||
3.4. | PRODUCT CONFIGURATION LIST | ||
3.4.1. Basic Configuration of the Product | |||
3.4.2. | Optional Components | ||
3.5. | UNPACKING FOR ACCEPTANCE | ||
3.5.1. | Preparation | ||
3.5.2. | Unpacking | ||
3.5.3. | Goods Acceptance |
4. Equipment Installation and Connection | ||
4.1. | CABINET INSTALLATION | |
4.1.1. Installation on the Cement Floor | ||
4.1.2. Installation on the Antistatic Floor | ||
4.1.3. Installing the Cabinet Guide Rails | ||
4.2. | INSTALLING THE EQUIPMENT | |
4.2.1. Installing the 10U Chassis | ||
4.2.2. Installing the Fan Module | ||
4.2.3. Installing the Air Deflector Frame | ||
4.3. CONNECTING THE POWER AND GROUNDING CABLES | ||
4.3.1. Connecting the Power Cables of the Equipment | ||
4.3.2. Connecting the Power Cable of the Fans | ||
4.3.3. Connecting the Grounding Cables | ||
4.3.4. Equipment Power Supply Test | ||
4.4. INSTALLING THE SERVICE PROCESSOR UNIT BOARD (SMUB) | ||
4.4.1. Installing the Uplink Interface Modules | ||
4.4.2. Installing the RTU |
3P@C Installation Manual
Page