SAGEM 3P@C

3.1.4.

Heat Dissipation Requirements

3-2

3.1.5.

Power Supply Requirements

3-2

3.1.6.

Grounding Requirements

3-2

3.1.7.

Anti-interference Requirements

3-4

3.1.8.

Other Requirements

3-4

3.2.

SAFETY REQUIREMENTS

3-5

3.2.1.

Basic Safety Requirements

3-5

3.2.2.

Antistatic Requirements

3-5

3.2.3.

Avoiding Laser Damage

3-6

3.2.4.

Lightning Protection Requirements

3-6

3.2.5.

Anti-seismic Design Requirements

3-7

3.2.6.

Fireproof Design Requirements

3-7

3.2.7. Precautions for Equipment Handling

3-7

3.3. INSTALLATION TOOLS AND MATERIALS

3-7

3.4.

PRODUCT CONFIGURATION LIST

3-8

3.4.1. Basic Configuration of the Product

3-8

3.4.2.

Optional Components

3-8

3.5.

UNPACKING FOR ACCEPTANCE

3-9

3.5.1.

Preparation

3-9

3.5.2.

Unpacking

3-10

3.5.3.

Goods Acceptance

3-14

4. Equipment Installation and Connection

4-1

4.1.

CABINET INSTALLATION

4-1

4.1.1. Installation on the Cement Floor

4-2

4.1.2. Installation on the Antistatic Floor

4-8

4.1.3. Installing the Cabinet Guide Rails

4-14

4.2.

INSTALLING THE EQUIPMENT

4-15

4.2.1. Installing the 10U Chassis

4-15

4.2.2. Installing the Fan Module

4-16

4.2.3. Installing the Air Deflector Frame

4-19

4.3. CONNECTING THE POWER AND GROUNDING CABLES

4-21

4.3.1. Connecting the Power Cables of the Equipment

4-21

4.3.2. Connecting the Power Cable of the Fans

4-22

4.3.3. Connecting the Grounding Cables

4-22

4.3.4. Equipment Power Supply Test

4-23

4.4. INSTALLING THE SERVICE PROCESSOR UNIT BOARD (SMUB)

4-23

4.4.1. Installing the Uplink Interface Modules

4-23

4.4.2. Installing the RTU

4-25

3P@C Installation Manual

Page 0-5Reproduction and communication in any form prohibited without the written permission of SAGEM SA