CHAPTER 4
4.Equipment Installation and Connection
Do not take down the “no dismount” seal of SAGEM sa on the chassis of 3P@C 4450E without prior consent of SAGEM sa. This seal must be intact before the agent or engineer of SAGEM sa maintain the 3P@C 4450E equipment you have purchased. If you really need to
Note dismount the chassis cover, please contact your agent to get the permission first. Otherwise, any consequences such as lack of maintainability caused by arbitrary operations shall be born by the user itself.
Only qualified technicians are allowed to install and maintain 3P@C 4450E and these technicians must receive sufficient technical training or have rich installation and operation experience.
Before installing 3P@C 4450E, check if the needed installation tools and materials are complete. Then remove the packing box of the equipment, take out the equipment and place in on the flat floor. Next, you can install the equipment in the following steps:
To install 3P@C 4450E, take the following steps:
Step 1 Install the 19’’ standard cabinet 2.2 m high.
Step 2 Install the equipment.
Step 3 Connect the power and grounding cables.
Step 4 Install the Service Processor Unit Board (SMUB).
Step 5 Install the service cards such as ADUB, ADUC and VDUB.
Step 6 Install dummy panels.
Step 7 Connect the subscriber cables.
Step 8 Connect the console cable.
4.1.Cabinet Installation
By the specific equipment room environment, the
Figure
19'' cabinet installation
The antistatic floor is available
Installation on | Installation on the |
the cement floor | antistatic floor |
End the
installation
3P@C Installation Manual
Page