SAGEM 3P@C
To know more about fibers, please refer to the contents in
Appendix C.
prompt
2.5.2.1-port Gigabit Short-wave Optical Interface Module (DS-1GSX)
The
1.1.1.14Structure of the
The front panel of the
Figure
Status LED
The front panel of the
1 standard SC gigabit
1 LINK status indicator
1 ACT status indicator
Of the above, the different states of LINK and ACT indicators show the port operating status. For details, refer to Table
1.1.1.15Indicators of the
Table
LED | Color | Display | Description | |
state | ||||
|
|
| ||
LINK | Green | Solid on | After a stable connection between a port and the | |
|
|
| equipment is established, the indicator of the port | |
|
|
| stays solid on. | |
|
| Off | The link on the port is down. | |
ACT | Green | Flashing | Data are being received/transmitted on the port | |
|
| Off | No data are being received/transmitted on the | |
|
|
| port. |
3P@C Installation Manual
Page | Reproduction and communication in any form prohibited without the written permission of SAGEM SA |