SAGEM 3P@C
One pair of scissors
One level bar
One percussion drill
One dust cleaner
If the equipment is to be installed on the antistatic floor, an additional electric saw should be prepared before the formal installation.
The following cables are needed for connection:
Power cables
Serial port console cables
Grounding cables
Network cables or fibers
Others that are needed include:
A computer with HyperTerminal software installed
The modules to be installed
3.4.Product Configuration List
3.4.1.Basic Configuration of the Product
Table
Item | Name |
| Quantity | Description |
1 | 3P@C | 4450E- | 1 PCS | Including a 10U chassis, a |
|
| backplane, a fan module, a fan | ||
| chassis kit |
|
| mounting support and an air |
|
|
|
| deflector frame |
2 | Accessories | for | 1 suite | Including engineering labels, cable |
| installation |
|
| ties, screws and |
|
|
|
| cables |
3 | DC power cable |
| 1 PCS | Cut as required |
4 | Grounding cable | 1 PCS | Cut as required |
3.4.2.Optional Components
Table
| Item | Optional Component |
| maximum | Accessories |
|
| ||
|
|
|
|
| configuration | Needed |
|
| |
| 1 | Service | Processor Unit | Board | 2 |
|
|
| |
|
| (SMUB) |
|
|
|
|
|
|
|
| 2 | VDSL Unit Board (VDUB) |
| 14 | A | suite | of |
| |
|
|
|
|
|
| subscriber cables |
| ||
| 3 | ADSL | Unit Board/Card | (ADUB, | 14 | A | suite | of |
|
|
| ADUC) |
|
|
| subscriber cables |
| ||
| 4 | Route Transfer Unit (RTU) |
| 1 |
|
|
| ||
| 5 | 2×2 |
|
|
| ||||
|
| interface module |
|
|
|
|
|
| |
| 6 | 2×2 |
|
|
| ||||
|
| interface module |
|
|
|
|
|
| |
| 7 | 2×2 |
|
|
| ||||
|
|
|
|
|
|
|
| ||
| 8 | VAS card |
| 2×2 |
|
|
| ||
|
|
|
|
|
|
|
|
|
|