To ensure the operation safety of the electrical interfaces on the

 

 

 

equipment, lightning protection measures must be taken when

 

 

 

the connection of the equipment involves outdoor cabling.

 

 

Note

 

 

 

 

 

3.2.5.Anti-seismic Design Requirements

The quakeproof intensity of telecom equipment building should be designed one degree higher than local construction intensity. Those equipment buildings in short of quakeproof intensity requirements have to be strengthened. The construction departments should be invited to join the design and its execution.

3P@C 4450E uses the following measures during the installation to withstand Richter 7 earthquake.

„The 10U chassis of 3P@C 4450E uses light and strong aluminium alloy structure. There are locking devices to fix the circuit boards within the cabinets.

„When combining sever cabinets together in the installation, you can lock the top between the two cabinets by two cabinet-combining boards, so that the multiple cabinets are lined up to form integrity.

„Consolidate the reinforcement between the cabinet of 3P@C 4450E and the equipment room. Fasten the cabinet with the floor via its supports and feet. When necessary, fasten the cabinet with the ceiling to make the cabinet integrated with the equipment room framework.

3.2.6.Fireproof Design Requirements

The fireproof design of the equipment room should accord with the Code of Design on Building Fire Protection and Prevention issued by the state. As a key fire protection unit, any communication building shall have its fire-proof class reaching Class II and Class I (for high-rise buildings). In the equipment room of 3P@C 4450E, emergency fire extinguishers should be equipped and automatic fire alarm systems are recommended inside the equipment room.

3.2.7.Precautions for Equipment Handling

„Preferably two or more persons are needed to move the equipment, lest the big weight of the equipment accidentally cause damage to the human body.

„Before dismounting or moving the equipment, cut off its power first.

3.3.Installation Tools and Materials

Unpack and inspect the equipment before installing it and place its components at a safe place. When moving parts, please wear gloves lest that any sweat should corrode the metal parts of the equipment.

The following tools are needed to install 3P@C 4450E:

„One cross screwdriver

„One straight screwdriver

„One spanner

„One pair of hydraulic pliers