SAGEM 3P@C
Figure
Next, repeat the above operations to install multiple general chassis of 3P@C 4450E in the cabinet.
1.When installing multiple general chassis of 3P@C 4450E in the cabinet, the installation of the first one in the cabinet can start from the top installation position or the bottom one
|
| of the cabinet. |
|
| 2. If upward cabling is adopted on site, the cabling should |
| prompt | be arranged from the bottom up from the bottommost |
|
| general chassis in the cabinet. Otherwise, the cabling |
|
| should be arranged from the top down from the topmost |
|
| general chassis in the cabinet. |
3P@C Installation Manual
Page | Reproduction and communication in any form prohibited without the written permission of SAGEM SA |