SAGEM 3P@C

 

 

Marking and drilling are the basic work of the equipment

 

 

hardware installation. If they are inaccurate, it will cause

 

 

great inconvenience to the later work. So their quality is the

 

Note

 

prerequisite to the whole project quality.

D. Cut out the holes

Cut out the through-holes with an electric saw on the antistatic floor according to the cabling hole marks.

1.1.1.42Position the supports

A. Mark lines on the cement floor

Place the supports beneath the antistatic floor and align the connection holes on the supports to the holes on the antistatic floor. With the support mounting holes as the template, make the position marks of the expansion bolts on the floor.

Strictly obey the method shown in Figure 4-15 to install the supports and make sure the connection holes at the inner side of the supports are aligned with the holes on the floor

Note while preventing the supports from shielding the cabling holes as much as possible.

Figure 4-15 Connection positions of the mounting holes for the support and the antistatic floor

Connection hole

Antistatic floor

(inner side)

 

Wire outlet of the floor

B. Drill holes in the cement floor

The support is fixed to the floor by means of expansion bolt M12. Normally a percussion drill is used to drill holes and the Φ14 orΦ16 drill bit is selected. To drill a hole, keep the drill bit vertical with the surface and hold tightly the drill handle and do not shake, lest the surface be damaged and the hole be slanted. The depth of the hole should be the length of the expansion bush plus the cone. All holes must be consistent in the depth. Remove the dust out of the hole while measuring the hole depth in order to get the net depth. While drilling, use a cleaner to remove the dust.

3P@C Installation Manual

Page 4-11