installation, 4-23,4-26 link integrity test, 4-24plastic standoffs, 4-21
lock and unlock, 4-21remove, 4-21
replace, 4-23retainer, 4-24
test manually, 12-9
cable configuration, D-5 tape adapter PCS assembly
remove, E-18 to E-19replace, E-19 to E-20
target IDs CD-ROM,C-1 disk board, C-1
default, C-2 tape drive, C-1
termination
disk board, 5-4I/O board, 4-4 tray, target IDs, C-1
service
hot-pluggable components, 13-1 preparing for, 13-1
setup, terminal, 9-1 shut down, system
Enterprise 4000, 12-3 Enterprise 6000/5000, 12-1
side panels See panel, remove
SIMM description, B-8 DRAMS used, 3-20 installation, 3-21 maximizing performance, 3-22 remove, 3-20
selection, B-9slot selection
clock board, 6-8 CPU/Memory board, 3-9 disk board, 5-8
I/O board, 4-14 Solstice Symon, 9-10 specification
electrical, A-3 environment, A-4 physical, A-1
stabilizer bar
adjust for safety, 13-11 standard features, 1-1 standoff
lock and unlock, 4-21 using, 4-21
SunVTS on-line validation test suite, 9-8 switch
AC, 12-5 local/remote, 12-7 reset, initiate POST, 12-9
symbols, definitions, 11-2system
cabinet features, B-3 master, B-8 overview, B-1 precautions, 11-4restart, 12-7
T
tape drive 4000 system
installation, 8-10 4000 systems
remove, 8-7replace, 8-9 6000/5000 systems
installation, 8-7remove, 8-5 replace, 8-7
SCSI target IDs, C-1 tray
description, B-15
terminal settings, 9-1termination
I/O board, 4-4 testing
drive, SBus card, 12-9 SunVTS on-line validation test
suite, 9-8