Tests and Diagnostics

3.29.2Modem test

For this subtest, connect the modem PCB and RJ11 connector with a harness. Use the dedicated “FAT-MODE inspection device (product code: QE2000P01 made by Nitto Denki Seisakusyo)” for the tests.

##################################################################

###### AC97' Modem Controller Diagnostics program #######

##################################################################

*

1

(ICHx)

*

*

*

*

2

(ICH6)

*

*

*

*

 

 

*

******************************************************************

.... Press test number[1-2] ?

To execute Modem test, press 2 and Enter. Following message will appear:

[Modem loopback test !]

ICHx MDC Test Program with Modem Sound (Line Test)

Version X.X

* Scorpio

Modem Initialize

:OK

*

Digital

Loopback Test

:OK

*

RJ11 Connector Check (LED)

:(Operator’s Check!!)

OK is displayed when a error is detected, NG is display when a error is not detected.

NOTE: The menu displayed by your computer may be slightly different from the one shown above.

RJ11 Connection Check (LED) (Operator’s Check LED) test will be executed, and the following message will appear:

...Press Key (Y = OK , N =NG)

If the color in the LED of the connection checker is orange, press Y, otherwise, press N.

PORTEGE M780 Maintenance Manual (960-809)

[CONFIDENTIAL]

3-85

Page 197
Image 197
Toshiba 960-809 manual Modem test, Modem loopback test